Team Project Assignment | Homework Help Websites
IT 243 TEAM PROJECT
Brief description
Students will conduct a systems analysis project by performing 3 phases of SDLC (planning, analysis and design) for a small (real or imaginary) organization. The actual project implementation is not required (i.e. No coding required.) They need to apply what they have learned in the class and to participate in the team project work.
Important dates
Proposal | Presentation | Final Report Submission |
Week 4 and 5 | Week 14 | Week 15 |
Process for the project | |||||
Performing a | Submitting a | ||||
group of 2-3 | Submitting a | final project | |||
students and | proposal that | report by the | |||
giving your | describes the | stated due | |||
Team a name | selected topic | date |
Selecting a | Each group |
topic/project | should |
defend their | |
work through | |
an oral | |
presentation |
What to include
This project should follow the main steps of the first three phases of the SDLC (phase 1, 2 and 3). Here is a list of these main requirements that are expected to be followed by all project groups.
Planning Phase
•Project identification/ Project Proposal
•Adopt a SDLC
development
methodology
•Develop a work plan (Task identification or Gantt chart)
Analysis phase
•Determine main business requirements
•Create Use Cases
•Model Processes (Data Flow Diagramming)
•Model data (ER modeling)
Design phase
•Select an architecture design
•Screens Design (create the User Interface Structure Design), and sample system screens. No need to be in HTML, they can be just drawing of how the screen will appear.
•Class Design Diagram
Implementation
phase
Not
included
Marking criteria
In total, 10 marks are allocated to this project which will be split as follow:
1 mark for | 5 marks for | 4 marks for | |
the project | the final | the | 10 marks |
proposal | report | presentation |
GENERAL POINTS
Groups will be created in the blackboard where members of each group can share ideas
and submit their work.
A single submission is enough; therefore, each group should have a leader to do this job. Two templates will be given to students to use them in the project work
Not respecting the deadline will result in 0 mark.
The project title goes here
Group name |
Group members | |
The proposed project | |
Title | |
Description | |
Users | |
Final output/product |